Documents

A - Technical reports


Hydrogeomorphological study report of Eo river basin enclaves. - Download pdf

Date: December 2018

Summary:
This report is part of the preparatory action A1 and includes a description of the Eo river basin, a geomorphological
cartography and analysis of soil samples for each enclave of the conservation actions C1, C2 and C3.
Hydrogeomorphological study report of Cecebre reservoir enclave - Download pdf

Date:
December 2018

Summary:
This report is part of the preparatory action A1 and includes a geomorphological cartography and
analysis of soil samples for each enclave of the conservation action C5.
Hydrogeomorphological study report of the Río Miño river basin enclave - Download pdf

Date:
December 2018

Summary:
This report is part of the preparatory action A1 and includes geomorphological cartography and
analysis of soil samples for each enclave of the conservation actions C6 and C7.
 

Hydrogeomorphological study report of the Estorãos river (Portugal) enclaves -
Download pdf

Date: December 2018

Summary:
This report is part of the preparatory action A1 and includes a geomorphological cartography and
analysis of soil samples for each enclave of the conservation action C8.

Monitoring indicators of conservation actions report - Download pdf

Date: March 2019

Summary:
This document establishes the monitoring indicators to be used in action D1,
as well as the methodology for its application.

Protocol for the elimination of invasive and alien species - Download pdf

Date:
December 2018

Summary:
This report is part of the preparatory action A1. The characteristics, distribution and control methods and management of all
alien species found in the enclaves of the project have been idescribed.

Vegetation analysis report for the conservation actions in the Eo river basin.
Download pdf

Date: December 2018

Summary:
This report is part of the preparatory action A1 and includes
vegetation cover characterization, detailed cartography and floristic inventories
for each enclave of C1, C2 and C3 conservation actions.

Vegetation analysis report for the conservation actions in the Betanzos-Mandeo SAC.
Download pdf

Date:
December 2018

Summary:
This report is part of the preparatory action A1 and includes
vegetation cover characterization and detailed cartography of C4 action enclaves.

Vegetation analysis report for the conservation actions in the Encoro de Abegondo-Cecebre SAC.
Download pdf

Date: March 2019

Summary:
This report is part of the preparatory action A1 and includes
vegetation cover characterization and detailed cartography of C5 action enclave.

Vegetation analysis report for the conservation actions in the Parda-Ladra-Támoga SAC.
Download pdf

Date: December 2018

Summary:
This report is part of the preparatory action A1 and includes
vegetation cover characterization and detailed cartography of C6 and C7 actions enclaves.




Vegetation analysis report for the conservation actions in the Río Lima SIC.
Download pdf

Date: February 2020

Summary:
This report is part of the preparatory action A1 and includes
vegetation cover characterization and detailed cartography of C8 action enclaves.

Update about habitat 91E0* in the Natura 2000 in Portugal.
Descarga pdf

Date: February 2019

Summary:
This report is part of the preparatory action A1 and includes a characterization of habitat 91E0*
in Portugal

Technical project for the improvement and restoration of natural habitats in the river estuary corridor Download pdf Date: Novembre 2018

Summary:
This document includes the technical planning of the conservation action C1.







Development of the action proposals - C1.
Download pdf

Date: April 2019

Summary:
This report complements the technical project and includes the specific details of the action
providing information and detailed maps of C1 actions.

Technical project for the improvement and restoration of the river corridor in the middle basin of the Eo river

(ZEC RIO EO-GALICIA ES1120002, ZEC RIO EO-ASTURIAS ES1200023) - Download pdf

Date: October 2018 Summary: This document includes the technical planning of the C2 conservation action.






Development of the action proposal - C2 - Download pdf

Date: April 2019

Summary:
This report complements the technical project and includes the specific details of the action
providing information and detailed mapping of C2 action






Complementary project for the conservation actions in the Fondón
recreational area (Vilaboa - A Pontenova) - C2 -
Descarga pdf

Date: November 2019

Summary:
This report complements the technical project and includes the specific details of the action.


Technical project for the improvement of the conservation status of the
Arnao-Villadún lagoons (ZEC / ZEPA RÍA DEL EO ES1200016).
Download pdf
Date:
December 2018

Summary:
This document includes the technical planning of the C3 conservation action.






Development of the action proposal - C3. Download pdf

Date: April 2019

Summary
This report complements the technical project and includes the specific details of the action contributing
information and detailed mapping of C3 actions.

Technical project for the improvement of the conservation status of the fluvioestuarine 
corridor of the Betanzos estuary
Download pdf

Date: May 2018

Summary:
This document includes the technical planning of the C4 conservation action.

Technical project for the sustainable management of hygrophilic forests in the 
ZEC Encoro de Abegondo-Cecebre.
Download pdf

Date: March 2019

Summary:
This document includes the technical planning of the conservation action C5.

Technical project for the improvement of river corridors in the Parga-Ladra-Támoga Zec.
Download pdf

Date:
May 2018

Summary:
This document includes the technical planning of the C6 conservation action.

Technical project for the sustainable management of inland wetlands in the upper Miño river basin.
Download pdf

Date: May 2018

Summary:
This document includes the technical planning of the C7 conservation action

Contingency Plan
. Download pdf

Date: February 2019

Summary:
This document includes LIFE Fluvial project contingency plan

 

C - Conservation actions


C3 actions report - Download pdf

Date: December 2019

Summary:
Report of the conservation actions carried out in the Arnao and Villadún (Castropol) enclaves of the action C3

C7 action reports
-
Downloads: 2018 and 2019

Date: December 2018 and december 2019

Summary:
Reports of the conservation actions carried out in the enclaves of the action C7

D - Monitoring of project impact indicators


Update of project progress indicators (2019) - Download pdf

Date: December 2019

Summary:
Report for the evaluation of project results

E - Public awareness and dissemination of results

Book of style. Download pdf
Corporate identity manual. Download pdf
Traveling exhibition



Brochure / Folder. Download pdf
Los Bolechas Children's Book. Downloads: Spanish - Portuguese - Galician
Merchandising

The realization of panels, posters, landmarks and two bird observatories is planned
Presentation day of the LIFE Fluvial Project in Mieres (Asturias) - 25/07/2017.  Download Report
Presentation day of the LIFE Fluvial Project in Ribadeo (Galicia) - 24/10/2017.  Download Report
Presentation day of the LIFE Fluvial Project in Ponte de Lima (Portugal) - 02/02/2018. Download Report
Presentation day of the LIFE Fluvial Project in Vegadeo (Asturias) - 19/02/2018 Informe
Presentation day of the LIFE Fluvial Project in Coirós (A Coruña)  - 22/03/2018. Download report
Open science Cambre 2019 - Cambre (A Coruña, España), 21-22/09/2019. Download report
The University of Oviedo in Europe. Success stories in research  (Asturias, España), 28/06/2019. Download new
Restaura Ríos, III Congreso ibérico Restauración Fluvial - Murcia (España), 12-14/06/2019. Download Summary
Feria de muestras de Vegadeo - Vegadeo (Asturias, España), 06-09/06/2019. Download brochure
VI Jornadas de la Conservación de la Biodiversidad - Salamanca (España), 01-03/03/2019. Download poster
Evento de Encerramento do Projeto de Capacitação Nacional - Lisboa (Portugal), 06-07/12/2018. Event
XVIII Semana de la ciencia y la tecnología de la Universidad de Oviedo - Oviedo (Asturias, España), 05-16/11/2019. Download programme
Gestión y manejo de humedales costeros en el marco de proyectos LIFE - Arnuero (Cantabria, España), 25-26/10/2018. Download Report
Open Science Cambre 2018 - Cambre (A Coruña, España), 15-16/09/2018. Download brochure
The 11th European SER Conference, Restoration in the Era of Climate Change - Reykjavick (Islandia), 09-13/09/2018. Download Summary, Download Poster
II Simposio Ibérico de Odonatología - Lugo (España), 29-30/06 y 01/07/2018. Download Summary, Download Poster 
VIII Congreso de la red mundial de reservas de Biosfera - Menorca (España), 22-26/05/2018. Download communication 
LIFE Águeda - Presentación del proyecto - Águeda (Portugal), 18/05/2018. Download Poster
Xornada, A Xestión e control das especies exóticas invasoras - Culleredo (A Coruña, España), 13/04/2018. Download Poster
Jornada sobre Reservas de la Biosfera - Ribadeo (Lugo, España), 23/03/2018. Download Poster
NATURA 2000 Network Day-2018. Download Poster
NATURA 2000 Network Day-2019. Download Poster
School workshop in the C.P. Jovellanos de Vegadeo (Asturias). December 2019. Download report
School workshops in the associated rural school Ría del Eo (Vegadeo, Asturias). May-June 2019 (Vegadeo, Asturias). May-June 2019. Download report.
School workshops in the municipality of  A Coruña (Galicia). March-May 2019. Download report.
School workshops in the municipality of Cambre (A Coruña, Galicia). March 2019. Download report.

School workshops in the municipality of Abegondo (A Coruña, Galicia). February 2019. Report. Download report.

School workshops in the municipality of Sada (A Coruña, Galicia). January-April 2019. Download report.
Volunteer day in Río Eo - Área recreativa de A Retorta (Ribeira de Piquin) 20/07/2019 - Download report
Volunteer day in  Guitiriz (Lugo) - 29/07/2019 - Download news
E-newsletter 2018: Download pdf

E-newsletter 2019: Download pdf
link to page News

This deliverable is scheduled for June 2021

Local workshops will be held to present the project to local and regional stakeholders.

A Manual of Good Practices  in the management of river corridors will be developed

Training and technical training sessions will be held aimed at technical staff of public administrations as well as other interested organizations and entities.

In the final phase of the project the final dissemination seminar will be held.

Este sitio web utiliza cookies para que usted tenga la mejor experiencia de usuario. Si continúa navegando está dando su consentimiento para la aceptación de las mencionadas cookies y la aceptación de nuestra política de cookies, pinche el enlace para mayor información.

ACEPTAR
Aviso de cookies