Documents

A - Technical reports


Report related to the action on the Eo river basin enclaves. - Download pdf

Date: December 2018

Summary:
Report corresponding to preparatory action A1. It contains a description of the EO river basin and a geomorphological
cartography andan analysis of soil samples in each enclave of the conservation actions C1, C2 and C3.
Report of the action sites in the Cecebre reservoir (A Coruña)- Download pdf

Date:
December 2018

Summary:
Report corresponding to preparatory action A1 with a analysis of soil samples in each of the action's enclaves C5.
Report on the enclaves of action of the Río Miño river basin - Download pdf

Date:
December 2018

Summary:
Report corresponding to preparatory action A1 with a geomorphological mapping and an analysis of soil samples
in each of the enclaves of action  C6 and C7.
 

 


Report of the action on the Estorãos river (Portugal)-
Download pdf

Date: December 2018

Summary:
Report corresponding to preparatory action A1 with a geomorphological mapping
and an analysis of soil samples in each of the enclaves of action C8.

Identification report on monitoring indicators of conservation actions - Download pdf

Date: March 2019

Summary:

This document establishes the monitoring indicators to be used in action D1,
as well as the methodology for its application.

Protocol for the elimination of invasive and alien species - Download pdf

Date:
December 2018

Summary:
This report is part of the preparatory action A1 where the characteristics, distribution and control methods and management of all invasive and
or alien species found in the enclaves of the project have been identified and described in the form of records.
Report related to vegetation analysis of the Eo river basin.  Download pdf

Date: December 2018

Summary:
This report corresponding to preparatory action A1 includes
a characterization of the vegetation cover which is shown in the form of files.
It shows, among other aspects, a cartography and inventories of vegetation
for all the enclaves of conservation actions C1, C2 and C3.

Report related to vegetation analysis. ZEC Betanzos-Mandeo
Download pdf

Date: December 2018

Summary:
This report corresponding to preparatory action A1 includes a characterization of the vegetation cover of conservation action C4.

Report related to vegetation analysis. ZEC Encoro de Abegondo-Cecebre.
Download pdf

Date: March 2019

Summary:
This report corresponding to preparatory action A1 includes a characterization of the vegetation cover of conservation action C5.

Report related to vegetation analysis. ZEC Parda-Ladra-Támoga.
Download pdf

Date: December 2018

Summary:
This report corresponding to preparatory action A1 includes a characterization
of the vegetation cover of conservation actions C6-C7.

Atualização do habitat 91E0* na Rede Natura em portugal continental.
Descarga pdf

Date: February 2019

Summary:
This report corresponding to preparatory action A1 includes a characterization of habitat 91E0 * in the action enclaves of LIFE Fluvialen Portugal

Technical project for the improvement and restoration of natural habitats in the river estuary corridor Download pdf Date: Novembre 2018

Summary:
This document includes the technical planning of the conservation action C1.


Development of the action proposals – C1.
Download pdf

Date: April 2019

Summary:
This report complements the technical project and includes the specific details of the action
providing information and detailed mapping of C1 actions.


Technical project for the improvement and restoration of the river corridor in the middle basin of the Eo river

(ZEC RIO EO-GALICIA ES1120002, ZEC RIO EO-ASTURIAS ES1200023)
Download pdf

Date: October 2018 Summary: This document includes the technical planning of the C2 conservation action


Development of the action proposal – C2. Download pdf

Date: April 2019

Summary:
This report complements the technical project and includes the specific details of the action
providing information and detailed mapping of C2 actions

Technical project for the improvement of the conservation status of the Arnao-Villadún lagoons (ZEC / ZEPA RÍA DEL EO ES1200016) . Download pdf
Date:
December 2018

Summary:
This document includes the technical planning of the C3 conservation action..


Development of the action proposal – C3. Download pdf

Date: April 2019

Summary
This report complements the technical project and includes the specific details of the action contributing
information and detailed mapping of C3 actions.


Technical project for the improvement of the conservation status 
of the fluvioestuarine corridor of the Betanzos estuary
Download pdf

Date: May 2018

Summary:
This document includes the technical planning of the C4 conservation action.

Technical project for the sustainable management of hygrophilic forests in the ZEC Encoro de Abegondo-Cecebre. Download pdf

Date: March 2019

Summary:
This document includes the technical planning of the conservation action C5.
Technical project for the improvement of river corridors in the Parga-Ladra-Támoga Zec.. Download pdf

Date: May 2018

Summary:
This document includes the technical planning of the C6 conservation action.

 

Technical project for the sustainable management of inland wetlands in the upper Miño river basin. Download pdf

Date: May 2018

Summary:
This document includes the technical planning of the C7 conservation action
Contingency Plan. Download pdf

Date: February 2019

Summary:
This document includes LIFE Fluvial project contingency plan

 

E - Public awareness and dissemination of results

Book of style. Download pdf
Corporate identity manual. Download pdf
Exposición itinerante



Folleto / Carpeta. Descarga pdf
Libro Infantil Los Bolechas. Descarga pdf
Articulos de promoción

The realization of panels, posters, landmarks and two bird observatories is planned
Presentation day of the LIFE Fluvial Project in Mieres (Asturias) - 25/07/2017.  Download Report
Presentation day of the LIFE Fluvial Project in Ribadeo (Galicia) - 24/10/2017.  Download Report
Presentation day of the LIFE Fluvial Project in Ponte de Lima (Portugal) - 02/02/2018. Download Report
Presentation day of the LIFE Fluvial Project in Vegadeo (Asturias) - 19/02/2018 Informe
Presentation day of the LIFE Fluvial Project in Coirós (A Coruña)  - 22/03/2018. Download report
Open science Cambre 2019 - Cambre (A Coruña, España), 21-22/09/2019. Download report
The University of Oviedo in Europe. Success stories in research  (Asturias, España), 28/06/2019. Download new
Restaura Ríos, III Congreso ibérico Restauración Fluvial - Murcia (España), 12-14/06/2019. Download Summary
Feria de muestras de Vegadeo - Vegadeo (Asturias, España), 06-09/06/2019. Download brochure
VI Jornadas de la Conservación de la Biodiversidad - Salamanca (España), 01-03/03/2019. Download poster
Evento de Encerramento do Projeto de Capacitação Nacional - Lisboa (Portugal), 06-07/12/2018. Event
XVIII Semana de la ciencia y la tecnología de la Universidad de Oviedo - Oviedo (Asturias, España), 05-16/11/2019. Download programme
Gestión y manejo de humedales costeros en el marco de proyectos LIFE - Arnuero (Cantabria, España), 25-26/10/2018. Download Report
Open Science Cambre 2018 - Cambre (A Coruña, España), 15-16/09/2018. Download brochure
The 11th European SER Conference, Restoration in the Era of Climate Change - Reykjavick (Islandia), 09-13/09/2018. Download Summary, Download Poster
II Simposio Ibérico de Odonatología - Lugo (España), 29-30/06 y 01/07/2018. Download Summary, Download Poster 
VIII Congreso de la red mundial de reservas de Biosfera - Menorca (España), 22-26/05/2018. Download communication 
LIFE Águeda - Presentación del proyecto - Águeda (Portugal), 18/05/2018. Download Poster
Xornada, A Xestión e control das especies exóticas invasoras - Culleredo (A Coruña, España), 13/04/2018. Download Poster
Jornada sobre Reservas de la Biosfera - Ribadeo (Lugo, España), 23/03/2018. Download Poster
NATURA 2000 Network Day-2018. Download Poster
NATURA 2000 Network Day-2019. Download Poster
School workshop in the C.P. Jovellanos de Vegadeo (Asturias). December 2019. Download report
School workshops in the associated rural school Ría del Eo (Vegadeo, Asturias). May-June 2019 (Vegadeo, Asturias). May-June 2019. Download report.
School workshops in the municipality of  A Coruña (Galicia). March-May 2019. Download report.
School workshops in the municipality of Cambre (A Coruña, Galicia). March 2019. Download report.

School workshops in the municipality of Abegondo (A Coruña, Galicia). February 2019. Report. Download report.

School workshops in the municipality of Sada (A Coruña, Galicia). January-April 2019. Download report.
Volunteer day in Río Eo - Área recreativa de A Retorta (Ribeira de Piquin) 20/07/2019 - Download report
Volunteer day in  Guitiriz (Lugo) - 29/07/2019 - Download news
E-newsletter 2018: Download pdf
link to page News

This deliverable is scheduled for June 2021

Local workshops will be held to present the project to local and regional stakeholders.

A Manual of Good Practices  in the management of river corridors will be developed

Training and technical training sessions will be held aimed at technical staff of public administrations as well as other interested organizations and entities.

In the final phase of the project the final dissemination seminar will be held.

Este sitio web utiliza cookies para que usted tenga la mejor experiencia de usuario. Si continúa navegando está dando su consentimiento para la aceptación de las mencionadas cookies y la aceptación de nuestra política de cookies, pinche el enlace para mayor información.

ACEPTAR
Aviso de cookies